Featured Article
Reprint: Aviation Refuel Planning Considerations
By Lt. Col. Gregory Sterley, Maj. Andrew Keithley, Capt. Joseph Keegan, and Capt. Ian Greer
Read Time: < 11
mins
As the Army resurrects division-level air assault for LSCO, this article breaks down the six
critical FARP limiting factors — capacity, fuel flow, crew duty day, and certification —
that can stop an air assault before it reaches the objective.